| Interstate 25, 0.6 miles West of US 84/285 ST FRANCIS DR. exit at mile marker 282 |
| Description: | Description: I 25/St. Francis Bridge Rehabilitation –The I-25 northbound and southbound lanes will have intermittent lane closures on the northbound and southbound lanes. Anticipated project completion Summer 2013.
Drivers are asked to watch for construction personnel working the area, observe temporary construction signing, and reduce speed to the posted speed limits. |
| Date Entered: | 10/1/2012 11:6 AM |
| Date Updated: | 5/23/2013 7:55 AM |
| Expiration Date: | 8/1/2013 1:0 AM |
|
| New Mexico 176 eastbound and westbound at Eunice at mile marker 35 |
| Description: | The work consists of Pavement Rehabilitation, New Curb and Sidewalk Construction, and Miscellaneous Construction.
The West Bound Lane will be closed and Traffic placed on the East bound Lane, 2 way traffic with 10 foot lanes. Wide loads are asked to seek an alternate route due to the width restrictions There will be heavy equipment working in the Construction Zone. Motorists are encouraged to pay attention to all Safety warnings and obey posted Speed Limits.
NMDOT Project Manager Gary Chavez 575-626-2289
NMDOT Assistant Project Manager Jeff Hatch 575-626-8679
Contractor Contact Shane Timms 575-602-3802 |
| Date Entered: | 1/31/2013 9:52 AM |
| Date Updated: | 5/10/2013 8:46 AM |
| Expiration Date: | 12/31/2099 0:0 AM |
|
| Interstate 40 eastbound and westbound from 1.5 miles East of BARD exit at mile marker 362 to 2.5 miles West of ENDEE exit at mile marker 368 |
| Description: | I-40, New Mexico Department of Transportation and FNF Construction advise all motorists of ongoing construction activities scheduled to begin October 22, 2012. Project consists of Pavement Rehabilitation of westbound and eastbound lanes from mile marker 362.0 to 368.0 (Bard to Endee Interchange), in Quay County.
This is a 65 working day project and the anticipated hot mix asphalt completion date is end of November 2012. Contractor is planning on placing OGFC by the end of the construction season if temperatures permit.
If not, work will be completed in the spring of 2013. Both westbound and eastbound traffic will be channeled into a single lane and a 12’ width restriction is in place to allow for milling and paving operations throughout the project. Haul trucks will be entering and exiting work zones throughout the project and caution should be used when traveling through both sections of roadway.
Please obey all construction signing and maintain the posted speed limit of 55 mph as double fines are enforced.
For any questions or concerns contact David M. Gonzales, Project Manager, at (575) 461-4619 or on his cell at (575) 512-6800. |
| Date Entered: | 10/26/2012 3:44 PM |
| Date Updated: | 5/21/2013 8:33 AM |
| Expiration Date: | 12/31/2099 0:0 AM |
|
| Interstate 25 northbound at mile marker 242 |
| Description: | Project A301220 / I-25 US 550 Interchange Improvement (Justin Gibson Project Manager/FNF Contractor) 240 calendar day project
Monday 5/20 through Friday 5/24 from 9 pm to 5 am each evening– I_25 northbound at exit 242 (Bernalillo) will be closed. I_25 through traffic will exit the interstate at exit 242 and immediately re-enter I_25 at the interchange onramp. |
| Date Entered: | 3/8/2013 4:8 PM |
| Date Updated: | 5/23/2013 2:16 PM |
| Expiration Date: | 12/31/2099 0:0 AM |
|
| New Mexico 599 northbound and southbound from mile marker 6 to mile marker 10 |
| Description: | NM 599- Roadwork - NM 599 & CR 62 Interchange to Camino La Tierra Interchange. Starting May 15 - NMDOT will begin earthwork activities and there will be heavy truck traffic and hauling in this area. Project is anticipated to be completed June 15, 2013. Drivers are asked to use caution, observe temporary construciton signing and observe posted speed limits. |
| Date Entered: | 5/15/2013 9:43 AM |
| Date Updated: | 5/23/2013 7:55 AM |
| Expiration Date: | 12/31/2099 0:0 AM |
|
| US 64 eastbound and westbound from 2.2 miles West of Bloomfield at mile marker 62 to 0.2 miles West of Bloomfield at mile marker 64 |
| Description: | Roadway reconstruction of US 64 for two miles within the City of Bloomfield. Work will be from mile post 62-64. The project will widen US 64 from four to six lanes. Medians will be installed along US 64 for access control, a major storm drain system will be installed. Contractor is Sterling Brothers. NMDOT Project Manager is Herman Patterson.
TRAFFIC IMPACTS
Three lanes of traffic in each direction will be maintained at all times.There are no restrictions at this time.
|
| Date Entered: | 8/3/2011 3:16 PM |
| Date Updated: | 5/23/2013 7:55 AM |
| Expiration Date: | 12/31/2099 0:0 AM |
|
| New Mexico 14 eastbound and westbound from mile marker 52 to mile marker 53 |
| Description: | NM 14 - Cerrillos Road - From the intersection of Cerrillos & St. Michael's Drive to the Intersection of Cerrillos & Cordova Road - Starting April 15 Sidewalk Improvement Project - Jared Rodriguez NMDOT Project Assistant. HO Construction contractor. Pedestrian sidewalks along the northbound and southbound side of Cerrillos Road will be closed as crews start to remove and replace curb ramps to meet ADA reuirements. Motorits will encounter intermittent lane closures and minor delays. Drivers are asked to proceed through the work zone with caution, watch for traffic control signing and reduce speed limit. |
| Date Entered: | 4/14/2013 10:54 AM |
| Date Updated: | 5/23/2013 7:55 AM |
| Expiration Date: | 12/31/2099 0:0 AM |
|
| New Mexico 500 eastbound and westbound at mile marker 2 |
| Description: | Project A300941 / NM 5_00 (Rio Bravo) from Coors to Broadway/ Roadway Rehabilitation Project (Chris Sinclair Project Manager/Mountain States Constructors) 45 working day project
• Ongoing and for the next 45 working days – N_M 5_00 (Rio Bravo) both directions from Coors to Broadway will have various single lane closures during milling and paving operation. Eastbound Rio Bravo activity restricted from 6am to 9am and Westbound activity restricted from 3pm to 6pm.
|
| Date Entered: | 4/1/2013 4:5 PM |
| Date Updated: | 5/23/2013 2:16 PM |
| Expiration Date: | 12/31/2099 0:0 AM |
|
| US 380 eastbound and westbound, 34.6 miles East of Roswell at mile marker 170 |
| Description: | The New Mexico Department of Transportation (NMDOT) has starting working on a mill and fill pavement preservation project on US 380 from MP 162 to MP 178 east and westbound. The $5,264,282.03 project will prolong the life of the highway. All work is expected to be complete by the end of June 2013.
Single-lane closures with a pilot car can be expected during the duration of this project. A 12 foot WIDTH RESTRICTION is in effect through the work zone. Hours of operation are from 7:00 a.m. to 6:00 p.m., Monday thru Friday. Drivers are asked to watch for construction personnel working in the area, observe the temporary construction signing, and reduce speed to the posted speed limits.
Questions and comments may be directed to Earle Smith, NMDOT Project Manager, at (575) 637-7811 or to Sterling Hamilton, James Hamilton Construction (505)918-3743.
|
| Date Entered: | 4/5/2013 9:35 AM |
| Date Updated: | 5/23/2013 11:17 AM |
| Expiration Date: | 12/31/2099 0:0 AM |
|
| US 70 eastbound and westbound, 26 miles West of US 70 - US 285 at mile marker 314 |
| Description: | The New Mexico Department of Transportation (NMDOT) has started working on a mill and fill pavement preservation project on US 70 from MP 301.955 to MP 325.619 east and westbound . The $4,276,264.34 project will prolong the life of the highway. All work is expected to be complete by the end of July 2013. There will be a single-lane closure with a 10 foot width restriction for approximately 5 miles. Hours of operation are from 7:00 a.m. to 5:00 p.m., Monday thru Friday. Drivers are asked to watch for construction personnel working in the area, observe the temporary construction signing, and reduce speed to the posted speed limits. Questions and comments may be directed to Earle Smith, NMDOT Project Manager, at (575) 637-7811, Bruce Bogart, Superintendent 505-350-5752. |
| Date Entered: | 5/9/2013 4:32 PM |
| Date Updated: | 5/23/2013 11:18 AM |
| Expiration Date: | 12/31/2099 0:0 AM |
|
| New Mexico 528 northbound and southbound at mile marker 15 |
| Description: | Project A300383 / NM 528 (DeArco Highway) from Enchanted Hills to US 550 Roadway Rehabilitation Project (Tim Chavez Project Manager/Albuquerque Asphalt Contractor) 120 calendar day project
• Ongoing through completion (120 calendar days/Approximately June 2013) – N_ M 5_28 from mile marker 14.2 to 15.3 (Enchanted Hills to U_S 5_50) will have activity on the shoulders and various lane closures for roadway rehabilitation.
|
| Date Entered: | 4/5/2013 4:34 PM |
| Date Updated: | 5/23/2013 2:16 PM |
| Expiration Date: | 12/31/2099 0:0 AM |
|
| New Mexico 18 from 2.6 miles North of Jal at mile marker 10 to 21.5 miles North of Jal at mile marker 18 |
| Description: | Work will consist of Shoulder Reconstruction, Cold Milling of existing Pavement, and new Asphalt paving. Motorists are encouraged to obey all warning signs, including posted construction zone speed limits. Double Fines exist in the Work Zone. Estimated completion is August of 2013.
NMDOT Project Manager is Gary Chavez, who can be reached at 575-626-2899, Assistant Project Manager Jeff Hatch, 575-626-8679.
Constructors Project Superintendent is Shane Timms, who can be reached at 575-602-3802, or Jon Franklin, Project Manager 575-706-7310. |
| Date Entered: | 2/6/2013 9:23 PM |
| Date Updated: | 5/10/2013 8:46 AM |
| Expiration Date: | 12/31/2099 0:0 AM |
|
| US 70 eastbound and westbound at mile marker 329 |
| Description: | Pavement resurfacing and curb line milling work is taking place on US 70 from Sycamore Street going west for approximately 4.13 miles from mile marker 325.61 to mile marker 329.72 east and west bound lanes. The project is expected to be complete by July 2013, weather permitting.
This project will require temporary lane closures; however, one lane of traffic will be maintained while work is under way. All work will take place Monday through Saturday between the hours of 7:00 a.m. and 6:00 p.m. excluding holidays.
For more information concerning this work please contract, Earle Smith, NMDOT Project Manager at 575-637-7811 or Willie McCray, NMDOT Project Sup. at 575-626-7294.
|
| Date Entered: | 5/16/2013 2:25 PM |
| Date Updated: | 5/23/2013 11:18 AM |
| Expiration Date: | 12/31/2099 0:0 AM |
|
| New Mexico 325 northbound and southbound and eastbound and westbound from Capulin at mile marker 0 to 0.9 miles North of Des Moines at mile marker 16 |
| Description: | New Mexico Department of Transportation and Brasier Asphalt Inc. advise all motorists of ongoing construction activities scheduled to begin Monday, May 13, 2013. Project consists of Plant Mix Wearing Overlay on East bound and West bound lanes from mile marker 0 to mile marker 16 (Des Moines to Capulin), in Union County. Hours of operation will be from 7:00 am to 5:00 pm Monday thru Sunday.
Both East bound and West bound traffic will be channeled into a single lane and a 12’ width restriction is in place to allow for milling and paving operations throughout the project. Contractor will be closing one lane for operations and will have a pilot car for all traffic. Haul trucks will be entering and exiting work zones throughout the project and caution should be used when traveling through both sections of roadway. Please obey all construction signing and maintain the posted speed limit of 55 mph is enforced.
For any questions or concerns contact P. Todd Gonzales, NMDOT Project Manager, at (575) 374-9517.
|
| Date Entered: | 5/14/2013 0:52 PM |
| Date Updated: | 5/21/2013 8:33 AM |
| Expiration Date: | 12/31/2099 0:0 AM |
|
| New Mexico 421, 10.6 miles East of Sedan at mile marker 8 |
| Description: | NM 421, New Mexico Department of Transportation and Versatile Construction advise all motorists of ongoing construction activities scheduled to begin April 1, 2013. Project consists of shoulder widening of westbound and eastbound lanes from mile marker 8.0 and mile marker 8.2 (Jct. of NM 402 to Texas State Line), in Union County.
This is a 30 working day project with a one lane closure throughout the project during working hours. Speed limit will be reduced to 35 mph during construction working hours with the posted Speed Limit remaining at 55 mph during non-working hours. Contractors scheduled work hours are; Monday through Friday, 7:00 am – 5:00 pm.
Don’t forget to Buckle Up!
For any questions or concerns contact Paul Todd Gonzales, Project Manager, at (575) 374-9517.
|
| Date Entered: | 4/3/2013 11:35 AM |
| Date Updated: | 5/21/2013 8:33 AM |
| Expiration Date: | 12/31/2099 0:0 AM |
|
| Interstate 25 northbound and southbound, 0.6 miles South of RATON PASS/PORT OF ENTRY exit at mile marker 460 |
| Description: | I-25, The NMDOT and Northern Mountain Constructors advise all motorists that the rehabilitation construction of the port of entry ramps on Interstate 25, mile marker 460 at the New Mexico/Colorado state line will be resuming the week of May 13, 2013. The final layer of pavement seal coat and striping should be completed by June 1, 2013, weather permitting. Please obey all construction signing and posted speed limit signs as double fines are enforced. Use extreme caution while traveling through this construction zone as construction vehicles are entering and exiting the work zones. Don’t forget to Buckle Up!
For any questions or concerns contact John M. Duran, Project Manager, NMDOT at (575) 445-9553 or cell phone (575) 643-5340. |
| Date Entered: | 7/25/2012 3:29 PM |
| Date Updated: | 5/21/2013 8:33 AM |
| Expiration Date: | 12/31/2099 0:0 AM |
|
| New Mexico 237 eastbound and westbound from 0.3 miles North of Tucumcari at mile marker 1 to 2.4 miles North of Tucumcari at mile marker 2 |
| Description: | New Mexico Department of Transportation and Cutler Repaving advise all motorists of ongoing construction activities scheduled to begin Monday, April 15, 2013 to May 3, 2013. Project consists of Milling and Paving of westbound and eastbound lanes from mile marker 1 to mile marker 2.4 (Jct. US 54 and NM 234 to 4th Street), in Quay County. Hours of operation will be from 7:00 am to 6:00 pm Monday thru Friday.
Motorists are to expect delays during working hours. Cutler repaving will have a pilot car throughout the work zone. Motorists are asked to wait on side streets for the Pilot car to pass by to assure that traffic is going the same direction. School buses will be affected with this project so we ask that they plan accordingly.
Both westbound and eastbound traffic will be channeled into a single lane and a 12’ width restriction is in place to allow for milling and paving operations throughout the project. Haul trucks will be entering and exiting work zones throughout the project and caution should be used when traveling through both sections of roadway. Please obey all construction signing and maintain the posted speed limit of 35 mph.
For any questions or concerns contact David M. Gonzales, Project Manager, at (575) 461-4619 or on his cell at (575) 512-6800.
|
| Date Entered: | 4/15/2013 8:33 AM |
| Date Updated: | 5/21/2013 8:33 AM |
| Expiration Date: | 12/31/2099 0:0 AM |
|
| New Mexico 63 northbound and southbound from 2 miles North of ROWE/NM 63 exit at mile marker 1 to 1 mile South of Pecos at mile marker 5 |
| Description: | NM 63, ROADWORK at mile marker 1.5 and mile marker 4.7. Star Paving is constructing Scenic Pullouts along NM 63. All work is being performed along the shoulders so motorists should reduce their speed and lookout for construction/contractor vehicles going in and out of workzone.
For any questions or concerns contact Anthony Martinez, Project Manager, NMDOT at (505) 454-3690. |
| Date Entered: | 12/7/2012 8:45 AM |
| Date Updated: | 5/21/2013 8:33 AM |
| Expiration Date: | 12/31/2099 0:0 AM |
|
| US 64 eastbound and westbound from mile marker 47 to mile marker 48 |
| Description: | US 64 - Roadwork Improvement project from Troy King Intersection to the La Plata Highway Intersection. This s a roadway rehabilitaion project, cold milling with inlay, new curb and gutter, and permanent signing. Four Corners is the contractor. NMDOT Bloomfield Project Assistant is Danny Ortiz.. Drivers are asked to proceed through the work zone with caution, observer temporary construction signing and posted speed limits.
Project is scheduled for completion on August 2013. |
| Date Entered: | 5/13/2013 9:15 AM |
| Date Updated: | 5/23/2013 7:55 AM |
| Expiration Date: | 9/3/2013 1:0 AM |
|
| Interstate 25 northbound and southbound from RATON SOUTH exit at mile marker 452 to 0.6 miles East of RATON NORTH exit at mile marker 454 |
| Description: | I-25, The NMDOT and Northern Mountain Constructors advise all motorists from mile post 451 to 454 that construction activities will resume the week of May 6, 2013. Final placement of pavement seal coat and striping will be completed by June 1, 2013, weather permitting. Both Northbound and Southbound I-25 along with Exit 451 US 64/87 ramps, should expect lane closures and ramp closures while this work is being performed. Please obey all construction signing and maintain posted speed limit signs as double fines are enforced. Use extreme caution while traveling through this construction zone as construction vehicles are entering and exiting the work zones. Don’t forget to Buckle Up!
For any questions or concerns contact John M. Duran, Project Manager, NMDOT at (575) 445-9553 or cell phone (575) 643-5340. |
| Date Entered: | 6/12/2012 9:54 AM |
| Date Updated: | 5/21/2013 8:33 AM |
| Expiration Date: | 12/31/2099 0:0 AM |
|
| New Mexico 206 northbound and southbound from US 82 - NM 206 exit at mile marker 0 to Tatum |
| Description: | Lane closures will be required throughout the duration of the Project, with flagpersons and pilot cars Guiding Motorists through the Work Zone. The Estimated Completion of this Project is 5-31-12.
The Travelling Public is urged to watch for Construction Personnel, observe all safety signing, and obey all posted Speed Limits.
NMDOT Project Manager is Gary Chavez 575-626-2289, Assistant Project Manager Jeff Hatch 575-626-8679/ or Lead Supervisor Willie McCray 575-626-7294.
Fisher Sand & Gravel Contact is Frank Lozano Jr. 505-249-9390.
|
| Date Entered: | 8/22/2012 9:31 AM |
| Date Updated: | 5/10/2013 8:46 AM |
| Expiration Date: | 12/31/2099 0:0 AM |
|
| US 54 northbound and southbound from mile marker 163 to mile marker 175 |
| Description: | New roadway construction is underway.A 12 FOOT WIDTH RESTRICTION is in place from 5/13/13 through 06/07/13 for construction work. Expect one closure with pilot car and 15 minute delays during this time. Motorists are asked to be aware of Construction Personnel and equipment working in the area and to obey posted construction speed limits and signing. Construction is expected to be completed in June 2013. NMDOT Project Manager, Nathan Palomarez 575-626-4278. Contractor James Hamilton Construction Company 575-388-1546. |
| Date Entered: | 4/25/2013 9:49 AM |
| Date Updated: | 5/20/2013 11:55 AM |
| Expiration Date: | 12/31/2099 0:0 AM |
|
| Interstate 25 northbound and southbound from 1.1 miles South of LAS VEGAS SOUTH exit at mile marker 343 to 1.7 miles North of NM 104 /UNIVERSITY AVE. exit at mile marker 347 |
| Description: | New Mexico Department of Transportation and Fisher Sand and Gravel advise all motorists of ongoing construction activities scheduled to begin Monday, April 15, 2013. Project consists of Pavement Rehabilitation of southbound and northbound lanes from mile marker 343.00 to mile marker 347.00 (South Exit 343 to North Exit 347), in San Miguel County. Hours of operation will be from 7:00 am to 7:00 pm Monday thru Friday.
Both southbound and northbound traffic will be channeled into a single lane and a 12’ width restriction is in place to allow for milling and paving operations throughout the project. Haul trucks will be entering and exiting work zones throughout the project and caution should be used when traveling through both sections of roadway.
Please obey all construction signing and maintain the posted speed limit of 55 mph is enforced.
For any questions or concerns contact Anthony Martinez, Project Manager, at (505) 454-3690 or Kenny Luján, Public Information Officer at (505) 617-5900.
|
| Date Entered: | 5/15/2013 8:23 AM |
| Date Updated: | 5/21/2013 8:33 AM |
| Expiration Date: | 12/31/2099 0:0 AM |
|
| New Mexico 90 eastbound and westbound from 23.8 miles South of Silver City at mile marker 22 to 17.7 miles South of Silver City at mile marker 27, left lane closed. |
| Description: | The NMDOT along with Cutler Repaving will be performing roadway maintenance work on NM-90 between mile markers 22.-27. Maintenance work will take place daily including Saturday. Operations will begin at 7:00 am until 6:00 pm until the project is complete. Traffic control will be in place with a pilot car assisting during working operations. Motorist should expect delays and proceed with caution. |
| Date Entered: | 5/10/2013 11:4 AM |
| Date Updated: | 5/17/2013 9:56 AM |
| Expiration Date: | 12/31/2099 0:0 AM |
|
| US 54 northbound and southbound from mile marker 94 to mile marker 107 |
| Description: | New roadway construction is underway. The Contractor will be working Monday though Friday from 6:30 am to 6:30 pm. Motorists should watch for equipment and personnel in the workzone and adhere to all construction signage. Speed limits have been reduced to 45 MPH between MP 94 to MP 103. Contacts: Jerry Hickman, NMDOT Project Manager- 575-585-2090 or 575-626-0804, Jim Hemm, FNF Superintendent- 602-989-4735, Contractor.
|
| Date Entered: | 12/9/2010 9:35 AM |
| Date Updated: | 5/23/2013 9:53 AM |
| Expiration Date: | 12/31/2099 0:0 AM |
|
| New Mexico 599 northbound and southbound from 12.9 miles North of NM 14 exit at mile marker 6 to 4 miles South of NM 599 - Camino La Tierra exit at mile marker 7, right lane closed. |
| Description: | NM 599 & CR 62 Connector Interchange- Starting May there will be intermittent lane closures on the northbound and southbound lanes of NM 599.
South Meadows and CR 62 Overpass are OPEN. Anticipated project completion is Summer 2013.
Drivers are asked to watch for construction personnel working the area, observe temporary construction signing, and reduce speed to the posted speed limits.
|
| Date Entered: | 5/29/2012 6:30 AM |
| Date Updated: | 5/23/2013 7:55 AM |
| Expiration Date: | 7/31/2013 1:0 AM |
|
| Interstate 40 eastbound and westbound from 1.4 miles West of SAN JON/NM 469 exit at mile marker 355 to 1.5 miles West of BARD exit at mile marker 360 |
| Description: | I-40, New Mexico Department of Transportation and Fisher Sand and Gravel advise all motorists of ongoing construction activities scheduled to begin Monday, April 8, 2013. Project consists of Pavement Rehabilitation of westbound and eastbound lanes from mile marker 355.00 to mile marker 359.50 (1.5 miles West of San Jon to 1.5 miles West of Bard), in Quay County. Hours of operation will be from 7:00 am to 5:00 pm Monday thru Friday.
Both westbound and eastbound traffic will be channeled into a single lane and a 12’ width restriction is in place to allow for milling and paving operations throughout the project. Haul trucks will be entering and exiting work zones throughout the project and caution should be used when traveling through both sections of roadway.
Please obey all construction signing and maintain the posted speed limit of 55 mph is enforced.
For any questions or concerns contact David M. Gonzales, Project Manager, at (575) 461-4619 or on his cell at (575) 512-6800.
|
| Date Entered: | 4/8/2013 11:12 AM |
| Date Updated: | 5/21/2013 8:33 AM |
| Expiration Date: | 12/31/2099 0:0 AM |
|
| New Mexico 418 from Deming at mile marker 14 to 11.3 miles East of NM 418 exit at mile marker 5, left lane closed. |
| Description: | The NMDOT along with Brazier continue roadway maintenance on NM-418 on mile marker 5-14. Working hours are daily including weekends from 7:00 a.m. until 6:30 p.m. with two mile increments of a pilot car assisting motorists during the working operation hours. Motorists are advised the speed limit in the work zone has decreased to 35 mph and should proceed with caution. |
| Date Entered: | 5/8/2013 10:43 AM |
| Date Updated: | 5/17/2013 10:6 AM |
| Expiration Date: | 12/31/2099 0:0 AM |
|
| US 82 northbound and southbound, 15 miles West of Artesia at mile marker 95 |
| Description: | Road construction underway on US 82, MP 92.54 to MP 95.07 from 6:00 am to 6:00 pm Monday thru Friday. Travelling public urged to watch for construction detour signing, observe temporary construction signing and reduce speed to the posted speed limits. An 11’ Width Restriction is in effect for this area. Expected completion is the fall of 2013. NMDOT Project Manager: Cecil Pendergrass (575)626-9873. JHCC Project Superintendant Jim Bauers (575)538-1779. |
| Date Entered: | 2/21/2013 11:37 AM |
| Date Updated: | 5/23/2013 0:32 PM |
| Expiration Date: | 12/31/2099 0:0 AM |
|
| New Mexico 28 from 13.6 miles North of Canutillo exit at mile marker 6 to 8.8 miles South of Vado at mile marker 7 |
| Description: | The NMDOT will continue roadway reconstruction on NM-28 in between the mile markers 6-11, starting May 20, 2013 until May 24, 2013. Working hours will be from 7:00 am until 3:30 pm. Motorists should be prepared to stop during these working hours as flagging operations will be stations on each end of the work zone. |
| Date Entered: | 5/10/2013 11:0 AM |
| Date Updated: | 5/20/2013 10:25 AM |
| Expiration Date: | 12/31/2099 0:0 AM |
|
| New Mexico 273 from mile marker 6 to mile marker 10 |
| Description: | The NMDOT along with C.F. Jordan Construction, LLC will start roadway rehabilitation on NM-136 from mile marker 4.2-9.33 and NM-273 from mile marker 6.52 to 9.33. This project will periodically have a single lane closures along the entire length of the project. Motorists are advised to proceed with caution and please obey traffic notifications. |
| Date Entered: | 2/15/2013 3:7 PM |
| Date Updated: | 5/20/2013 10:25 AM |
| Expiration Date: | 12/31/2099 0:0 AM |
|
| US 54 northbound and southbound from mile marker 81 to mile marker 82 |
| Description: | Construction on the Bridge is complete and the traveling public can now pass over the Bridge. The width restriction have been lifted and the posted speed limit is 45. Construction work is still going on in the right a way, watch for equipment and personnel in the are and adhere to construction signing. Railroad Ave. is now open to traffic.
NMDOT Project Manager is Jerry Hickman 575-626-0804. La Calerita Construction Supervisor is Mike Powley - 575-430-0852.
|
| Date Entered: | 2/21/2012 7:44 AM |
| Date Updated: | 5/23/2013 9:53 AM |
| Expiration Date: | 12/31/2099 0:0 AM |
|
| US 54 eastbound and westbound from 13.7 miles West of Carrizozo to 5.3 miles West of Carrizozo |
| Description: |
FNF Construction has completed the new roadway and is now working on minor operations.
FNF Superintendent is Brian Heck, 602-292-9253, Traffic Control Supervisor, Robert Zook, 602-818-5971. NMDOT Project Manager, Jerry Hickman 575-626-0804.
|
| Date Entered: | 9/20/2012 8:10 AM |
| Date Updated: | 5/23/2013 9:53 AM |
| Expiration Date: | 12/31/2099 0:0 AM |
|
| New Mexico 9 from 11.7 miles West of Animas at mile marker 4 to 2.8 miles East of Animas at mile marker 15 |
| Description: | The NMDOT will continue chip seal roadwork on NM-9 from mile marker 4 to 15. Roadwork will be from 8:00 am until 5:30 pm starting Monday May 20, 2013 until Friday May 24, 2013. Traffic control will be in place with a pilot car assisting during working operations. Motorists should expect delays during working operations and proceed with caution. |
| Date Entered: | 5/17/2013 9:53 AM |
| Date Updated: | 5/17/2013 9:53 AM |
| Expiration Date: | 12/31/2099 0:0 AM |
|
| US 70 eastbound and westbound from 1.1 miles West of Las Cruces at mile marker 147 to 35.3 miles North of Las Cruces at mile marker 148, left lane closed. |
| Description: | The NMDOT and Star Paving continue with be working around the water in-lets with milling and paving operations on hold until the week of May 28th. Lane restrictions will be posted from Main Street to Alameda Drive. Motorists are advised to seek an alternate route as BNSF will be working within the same area with repair work to the raill road tracks. Business owners and residents will have access; however may encounter delays due to heavy equipment and paving operations. Please proceed with extreme caution. |
| Date Entered: | 3/1/2013 3:56 PM |
| Date Updated: | 5/21/2013 8:12 AM |
| Expiration Date: | 12/31/2099 0:0 AM |
|
| US 380 eastbound and westbound, 8.8 miles East of Roswell at mile marker 159 |
| Description: | The New Mexico Department of Transportation (NMDOT) has starting working on a cold milling and paving project on US 380 from MP 156 to MP 162 east and westbound. The $2.1 million project will prolong the life of the highway. All work is expected to be complete by the end of July 2013.
Single-lane closures with a pilot car can be expected during the duration of this project.A 12 foot WIDTH RESTRICTION is in effect through the work zone. Hours of operation are from 7:00 a.m. to 6:00 p.m., Monday thru Friday. Drivers are asked to watch for construction personnel working in the area, observe the temporary construction signing, and reduce speed to the posted speed limits.
Questions and comments may be directed to Earle Smith, NMDOT Project Manager, at (575) 637-7811 or to Steve Roper, Mountain States Constructors (505)270-4723.
|
| Date Entered: | 4/25/2013 10:52 AM |
| Date Updated: | 5/23/2013 11:17 AM |
| Expiration Date: | 12/31/2099 0:0 AM |
|
| New Mexico 47 northbound and southbound at mile marker 39 |
| Description: | • Monday 4/29 Through Saturday 6/8 from 6 am to 6 pm each day (Cutler)– N_M 47 both directions from mile marker 36 to 39 (Junction of N_M 1_47 to Isleta Casino) will have various lane closures for paving operation. Directional working hours are 6 am to 3:30 pm southbound and 8:30 am to 6 pm northbound. |
| Date Entered: | 4/26/2013 11:51 AM |
| Date Updated: | 5/23/2013 2:16 PM |
| Expiration Date: | 6/8/2013 6:0 PM |
|
| US 70 southbound, 0.7 miles West of Elida at mile marker 397 |
| Description: | Road construction underway on US 70, mile post 397.0 to mile post 395.0, from 6:00 am to 6:00 pm Monday thru Friday. Motorists can expect one lane closure during the road work and watch for haul trucks entering and exiting the roadway at Junction 480 mile post 12.9 and US 70 mile marker 416.. Expected completion is May , 2013. Emergency Contacts: NMDOT Project Manager Richard Gonzales, 575-626-9875. Pat Garcia Asst. Supervisor, 575-626-9889. Contractor, Mountain States Superintendent, Bruce Bogard, 505-570-1916. |
| Date Entered: | 2/26/2013 9:53 AM |
| Date Updated: | 5/23/2013 6:55 AM |
| Expiration Date: | 12/31/2099 0:0 AM |
|
| New Mexico 48 from mile marker 0 to mile marker 4 |
| Description: | FNF Construction will be conducting roadway rehabilitation on NM 48 (Sudderth Dr.) in the Village of Ruidoso beginning May13, 2012. Work will take place from 6:00 am to 6:00 pm Monday through Thursday and is expected to be completed by the end of July 2013. Motorists can expect one lane closures with flaggers during the posted work hours. Access to business will only be limited within the work zone as it progresses through the downtown. Work will begin at the US 70-NM48 intersection.
Motorists are asked to be aware of personnel and equipment in the area and to obey all posted construction signage.
For questions or concers please contact the following:
Jerry Hickman NMDOT- 575-585-2090/575-626-0804
Brian Heck FNF Construction- 602-292-9253
|
| Date Entered: | 4/30/2013 11:18 AM |
| Date Updated: | 5/23/2013 9:53 AM |
| Expiration Date: | 12/31/2099 0:0 AM |
|
| Interstate 40 eastbound and westbound at mile marker 140 |
| Description: |
Project A300660 / I-40 Rio Puerco Interchange Improvement (Chris Sinclair Project Manager/AUI INC. Contractor) 210 calendar day project
• Ongoing through completion (210 calendar days/Approximately September 2013) – I_40 both directions at Rio Puerco interchange (mile marker 140) will have activity on the shoulders and various lane closures at night to construct median detour.
|
| Date Entered: | 2/22/2013 4:31 PM |
| Date Updated: | 5/23/2013 2:16 PM |
| Expiration Date: | 12/31/2099 0:0 AM |
|
| US 70 eastbound and westbound from LAS CRUCES CLOVERLEAF US 70 exit at mile marker 151 to NASA Rd. exit at mile marker 161, left lane closed. |
| Description: | NMDOT and Smith and Aguirre construction will have construction along US-70 starting at Del Rey Boulevard Exit to NASA exit (mile marker 151-161). The contractor will have 12 foot lane restrictions in 2 mile increments. The daily operations and inside lane closures from Weisner Road to Holman Road will be ongoing Monday through Thursday from 9:00 am until 3:00 pm. Motorists will encounter left lane closures as vehicles approach the work zone throughout the duration of the project. Saturday May 18 - Sunday May 19, 2013 the contractor will NOT be working. |
| Date Entered: | 2/1/2013 2:17 PM |
| Date Updated: | 5/20/2013 10:25 AM |
| Expiration Date: | 12/31/2099 0:0 AM |
|
| New Mexico 136 from mile marker 4 to mile marker 9 |
| Description: | NMDOT along with C.F. Jordan Construction, LLC will continue roadway rehabilitation on NM-136 from mile marker 4.2 to 9.33 and NM 273 from mile marker 6.52-9.33. This project will periodically have a single lane closure along the entire length of the project. Motorists are advised to proceed with caution and please obey traffic notifications. |
| Date Entered: | 2/15/2013 3:5 PM |
| Date Updated: | 5/20/2013 4:18 PM |
| Expiration Date: | 12/31/2099 0:0 AM |
|
| New Mexico 419 eastbound and westbound from Trementina at mile marker 0 to Trementina at mile marker 47 |
| Description: | NM 419, ROADWORK between mile marker 0 to mile marker 47 (Trementina to Jct. of NM 39). NMDOT crews are working on fixing or replacing the six timber bridges that were in need of replacement. NMDOT has restricted the speed limit to 20 mph until all these bridges deficiencies are corrected these speed restrictions will remain in place. The listing of bridges with locations is as follows:
1. Bridge No. 5299 at MP 7.17
2. Bridge No. 5968 at MP 8.36
3. Bridge No. 5966 at MP 10.48
4. Bridge No. 5965 at MP 13.06
5. Bridge No. 6257 at MP 17.52
6. Bridge No. 6453 at MP 27.48
Detours have been constructed consisting of steel culverts installed by NMDOT District 4 maintenance crews. The detours will remain in place until resources become available to replace the damaged bridge.
Remember, seat belts save lives. Buckle up and drive safely!
Questions, Comments or Concerns, please contact Kenny Luján District Four Public Information Officer at 617-5900. |
| Date Entered: | 8/2/2012 2:45 PM |
| Date Updated: | 5/21/2013 8:33 AM |
| Expiration Date: | 12/31/2099 0:0 AM |
|
| Interstate 40 eastbound and westbound from mile marker 132 to mile marker 139 |
| Description: | Project A301191 / I_40 from mile marker 131.89 to 138.91Mill & Inlay/OGFC Project (Chris Sinclair Project Manager/Mountain States Constructors) 45 calendar day project
• NEW! Wednesday 5/8 through Friday 6/28 from 7 am to 6 pm each day (Mountain States) – I_40 both directions from mile marker 131.89 to 138.89 (from the Cibola County line east for 7 miles) will have various single lane closures for milling and paving operation. Expect minor delays!!
|
| Date Entered: | 5/7/2013 4:56 PM |
| Date Updated: | 5/23/2013 2:16 PM |
| Expiration Date: | 12/31/2099 0:0 AM |
|
| Interstate 25 northbound and southbound from 0.7 miles South of HOT SPRINGS LANDING exit at mile marker 83 to 0.2 miles South of Bernardo at mile marker 175 |
| Description: | NMDOT in conjunction with Apache Construction will be working on guardrail upgrades on Interstate 25 from mile marker 83-175 from February 2013 until November 2013. Contractors will be operating daily, Monday through Thursday from 7:00 am until 5:00 pm. Motorists will encounter lane drops and reduction in speed at various locations as this progress. |
| Date Entered: | 2/1/2013 2:3 PM |
| Date Updated: | 5/17/2013 9:57 AM |
| Expiration Date: | 12/31/2099 0:0 AM |
|
| New Mexico 333 eastbound and westbound from mile marker 4 to mile marker 12 |
| Description: | Project A300412 /413 N_M 3_33 from mile marker 4.4 to 11.9 (Tijeras Canyon) Concrete Repair Project (Jeremy Maestas/ Project Manager/Mountain States Constructors) $3 M (May to August)
• Tuesday 5/28 until project completion 8 pm to 6 am each evening – N_M 3_33 both directions from mile marker 4.4 to 11.9 (Tijeras Canyon) will have various lane closures for road reconstruction. Flagmen will be onsite at times to move traffic through the work zone. Expect Minor Delays!!
|
| Date Entered: | 5/23/2013 2:18 PM |
| Date Updated: | 5/23/2013 2:18 PM |
| Expiration Date: | 12/31/2099 0:0 AM |
|
| New Mexico 371 from Farmington at mile marker 62 to 41.7 miles South of Farmington at mile marker 73 |
| Description: | NM 371 -Construction project is south of Farmington - Roadway rehabilitation work on NM 371 for 11.7 miles. The contractor for this project is Skanska. NMDOT Project Assistant is Elliot Montgomery. Anticipated Project Completion is summer 2013.
Motorists will encounter a pilot car operation that will escort traffic through the one lane closure for a two mile work zone. Motorcycles are to use extreme caution through the work zone. Drivers are asked to proceed through the project with caution, observe traffic control signing, and reduce speed to posted limits. |
| Date Entered: | 4/19/2013 9:35 AM |
| Date Updated: | 5/23/2013 7:55 AM |
| Expiration Date: | 12/31/2099 0:0 AM |
|
| US 70 northbound and southbound at Portales at mile marker 421 |
| Description: | Road construction underway on US 70, mile post 421.60 to mile post 423.330, from 6:00 am to 6:00 pm Monday thru Friday. Work is underway from the intersection of S. Ave K/Second St to the intersection S. Ave C/ Second St. Ave C to Ave I on First St. Motorists can expect one lane closure in this area and are asked to observe construction signing and watch for personnel working in the area. Width restriction 11 Feet. Expected completion is August , 2013. Emergency Contacts: NMDOT Project Manager Richard Gonzales, 575-626-9875. Pat Garcia Asst. Supervisor, 575-626-9889. Contractor Constructors Inc. Angel Vega Superintendent, 575-706-7310, John
Guldemann, 505-397-4102 |
| Date Entered: | 5/15/2012 1:49 PM |
| Date Updated: | 5/23/2013 6:55 AM |
| Expiration Date: | 12/31/2099 0:0 AM |
|
| New Mexico 338 from Animas at mile marker 24 to ANIMAS exit at mile marker 0 |
| Description: | NMDOT will continue chip seal roadwork on NM-338 from Animas at mile marker 0-24. Operation work will be from 8:00 am until 5:30 pm starting Monday May 20, 2013 and will last till Friday May 24, 2013. Motorists should expect delays during these working hours. Traffic control will be in place with a pilot car assisting during working operations. Proceed with caution. |
| Date Entered: | 5/17/2013 9:49 AM |
| Date Updated: | 5/17/2013 9:49 AM |
| Expiration Date: | 12/31/2099 0:0 AM |
|
| US 84 northbound and southbound at mile marker 183, -lane- lane and left shoulder and right shoulder closed. |
| Description: | US 84/285 - Pojoaque Interchange -between Espanola and Santa Fe- Contractor is AUI. NMDOT Project Assistant is Max Vigil.
Starting May 17 the southbound traffic on US 84/285 will be detoured onto the newly constructed west frontage road. There will continue to be lane closures on the northbound and southbound lanes between 9 a.m. and 4 p.m. Monday through Friday.
-The lane closures will be removed at the end of each workday, opening up two lanes of traffic in each direction. The posted speed limit during lane closures is 35 mph and 45 mph during non-working hours.
Motorists’ speed is being monitored by the New Mexico State Police.
NMDOT urges motorists to proceed through the work zone with caution, watch for traffic control signing and flaggers, and observe the reduced speed limit. |
| Date Entered: | 1/15/2013 0:4 PM |
| Date Updated: | 5/23/2013 7:55 AM |
| Expiration Date: | 12/3/2013 1:0 AM |
|
| US 82 from mile marker 35 to mile marker 43 |
| Description: | The US Forest Service is conducting roadway construction on US 82, ½ mile east of Mayhill east to the Otero-Chaves County line from MP 35 to MP 43. There will be a WIDTH RESTRICTION of 10 feet throughout the project. Wide loads should seek an alternate route (US 70). Motorists can expect a one lane closure during the daytime work hours with flaggers or pilot car. Please obey all posted construction signage and posted speed limits and watch for equipment and construction personnel in the area. This project is expected to be completed in August 2013. Contractor: Mesa Verde Enterprises Superintendent: Daniel Lurtsema, (575) 491-3048; NMDOT Contact: Earle Smith, Res. Eng. – 575-585-2090. |
| Date Entered: | 4/22/2013 9:39 AM |
| Date Updated: | 5/16/2013 7:52 AM |
| Expiration Date: | 9/14/2013 1:0 AM |
|